16.04.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, building materials have been loaded onto the floors and the laying of walls with ceramic block is in progress. In Block B, reinforcement of the foundation slab and installation of the retaining wall formwork is underway. Excavation work is underway in Block D. Dismantling of the vertical structure formwork continues.