19.05.2024 Wyndham Grand Residences Batumi Gonio. Riviera Ceramic block walls are being laid on the 1st and 2nd floors of Block A. In Block B, reinforcement of the floor slab continues. Earthworks are underway in Block C. Installation of formwork for the floor slab of the 2nd floor of the infrastructure building has started.