20.04.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A the walls are being laid with ceramic block on the floors. In Block B, dismantling of the vertical structure formwork was carried out. Backfilling and waterproofing of the underground part of the infrastructure building foundation is carried out.