22.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, ceramic block masonry is being laid on the second and third floors. Fireplaces are being installed in block E. In Block B the installation of vertical structures formwork is in progress. In block C the dismantling/assembling of the formwork of vertical structures is carried out.