28.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the second and third floor ceramic block walls are being built. In block E the fireplaces are being installed and the staircase is being reinforced. In Block B, the formwork of vertical structures is being assembled.