29.06.2024 Wyndham Grand Residences Batumi Gonio. Riviera In block A, the second and third floor ceramic block walls are being built. In block E the fireplaces are being installed, the staircase has been concreted. Concreting of the floor slab and vertical structures took place in Block B.