Elite Family Residence 1. Laying of porcelain stoneware, units on the 2nd and 4th residential floor Leveling of the surface and laying of tiles in compliance with the joints and the necessary techniques to ensure the strength and durability of the coating. 2. Facing of staircases with marble Includes preparation of the base, laying of slabs on the glue taking into account the markings and joints. 3. Facade works Installation of decorative elements on the east facade to create an aesthetic and protected appearance of the building. 4. Installation of decorative elements, units on the 2nd floor Also ongoing are the installation of metal railings on the balconies, installation of drywall rails on the staircases and plumbing work in the penthouses.