Wyndham Grand Batumi Gonio. Riviera. 1. Block A. Waterproofing. Insulation installation on the terraces of the 3rd floor. 2. Block E. Installation of fire-places. Installation of flue stacks. 3. Block E. Plastering. Facade plastering. 4. Block E. Plastering. Facade plastering. 5. Infrastructure building Formwork installation for pouring of cast-in roof decks and columns. - European Village

Wyndham Grand Batumi Gonio. Riviera.

1. Block A. Waterproofing.
Insulation installation on the terraces of the 3rd floor.

2. Block E. Installation of fire-places.
Installation of flue stacks.

3. Block E. Plastering.
Facade plastering.

4. Block E. Plastering.
Facade plastering.

5. Infrastructure building
Formwork installation for pouring of cast-in roof decks and columns.