Wyndham Grand Batumi Gonio. Riviera. 1. Ceramoblock masonry. Block B on the 3rd floor, Block C on the 1st floor, Block E on the 3rd floor Check all dimensions and compliance with technological norms. 2. Block A. Drilling of engineering holes Marking and drilling is carried out, which is necessary for installation of communications of the future hotel. 3. Block C. Pouring monolith on the terrace Provides strength and durability of the structure. 4. Block C. Pouring monolithic belt on the roof parapet To ensure the rigidity and stability of the roof structure. 5. Dismantling and installation of stairway formwork To remove the temporary structure that supported the concrete before it cured, allowing further construction work to proceed.