07.08.2024 Elite Family Residence Painting works are being carried out on 2 construction (1 residential), 3 (2) floors and mockup. Facade works, installation of apartment electric boards, installation of GKL in common areas, installation of low-current water fire extinguishing systems, installation of water fire extinguishing system pipes, installation of gas silicate block on the -1 floor, wiring of cable lines for lighting of balconies and earthing of the building are in progress.