19.08.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, staircase formwork is being assembled. In Block B – laying of ceramic block walls. In block C – reinforcement of the floor slab on the second floor. And in block E – drilling of technological holes in the roof.