23.08.2024 Wyndham Grand Residences Batumi Gonio. Aqua Pouring of concrete sides (frames) of balconies and their waterproofing, installation of gypsum cardboard frame of internal partitions, drilling of technological holes in floor slabs continue at the facility. Ceramoblock walls are being laid on the 20th floor.