25.08.2024 Wyndham Grand Residences Batumi Gonio. Riviera In blocks A and B the formwork for staircases is being assembled. Laying of ceramic block in block B on the second floor is in progress. In block C the formwork of columns is being assembled. And in block E – plastering of parapets is in progress.