26.08.2024 Wyndham Grand Residences Batumi Gonio. Riviera In Block B, the ceramic block on the second floor is being laid and the fireplaces are being laid. In Block C, the columns are being poured with concrete, in Blocks A and B, the staircases are being concreted, and in Block E, the parapets are being plastered.