29.08.2024 Elite Family Residence Plasterboard rails are being installed on the walls of the bathrooms and metal railings are being installed. Finishing works on the north and south facade and roof ventilation shafts are in progress. Finishing of the western facade has been started. The elevator shaft is being prepared for the installation of the elevator. Electrical work is underway on the first floor and floor tiling is underway in the mockup.