09.09.2024 Wyndham Grand Residences Batumi Gonio. Aqua Balconies are being framed with reinforced concrete edges, ceilings are being dusted, plasterboard framework of internal partitions is being installed, diamond drilling of engineering holes in floor slabs, temporary waterproofing. Stained glass windows are being installed. Ceramoblock masonry continues on the 20th floor.