Wyndham Grand Batumi Gonio. Villas Column formwork is being assembled on Villas 1 and 4. Formwork of the floor slab is being assembled on villas 3 and 5. Insulation of the foundation walls from the inner side continues on villa 11, reinforcement of the foundation walls is being done on villa 12, the bottom part of the foundation is being built on villa 14. Trenching for the gas pipe is in progress on the territory.