Wyndham Grand Batumi Gonio. Villas Villas 1 and 4: 3. Installation of staircases and formwork for four columns. Villas 3-5: reinforcement of the floor slab. Villas 11 and 13: backfilling of the base into the foundation, installation of the sewerage system at the level below the zero level. Villa 15: completion of reinforcement of the foundation footings. The site is also undergoing site planning along the concrete fence wall.