Elite Family Residence The following works are carried out at the object: 1. Plastering works, on the 6th floor. Plastering of walls is carried out, taking into account evenness and quality application of the mixture. 2. Plastering of walls, on the 3-4th floor. Puttying is performed to prepare surfaces for finishing. 3. Installation of gypsum plasterboard framework in bathrooms, slopes. Includes installation of metal profiles, which are fixed on the walls and ceiling, creating a framework for future partitions and slopes, taking into account humidity conditions and the necessary sound insulation. 4. Facing staircases with marble. Includes preparation of the base, laying the slabs on the glue, taking into account the markings and seams, and then their polishing and puttying to achieve gloss and protection. Also includes work on the installation of metal railings in the penthouses, monolithic work on the retaining wall and the installation of moldings in the mocap.