Wyndham Grand Batumi Gonio. Aqua The following works are carried out at the site: 1. Diamond drilling of engineering holes, 8 and 10 floors The marking and drilling is carried out, which is necessary for the installation of communications of the future hotel. 2. Arrangement of mocap, 12th floor Allows to visualize and check the design and materials of the hotel room. 3. Welding of decorative boxes from corners, painting of corners It is necessary to create a solid base for the installation of decorative elements. 4. Facade arrangement Facade arrangement works on the 5th-6th floor of the building have been started.