Wyndham Grand Batumi Gonio. Family Club. Building A 1. Formwork is installed, concrete is poured and compacted. Upon completion of the concrete strength, the formwork is dismantled and the stained glass windows are installed. 2. Plastering of parapets, on the roof of Building B 1. Reinforcement of vertical structures, 5th floor Laying of reinforcement frames in accordance with the norms. Checking for compliance with the project and quality control of materials used 2. Ceramoblock masonry, 3rd floor Checking all dimensions and compliance with technological norms.