Wyndham Grand Batumi Gonio. Family Club. Building A 1. Plastering, the 2nd, 3rd floors. Plastering of inner walls. 2. Installation of drywall framing, on the 1st floor. Installation of guide frames for drywall partitions, drywall frame installation. 3. Cast-in belt pouring for roof parapets. Concrete pouring. Building B. 1. Installation of ledges for the stained glass windows. On the 2nd floor. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Building A
1. Plastering, the 2nd, 3rd floors.
Plastering of inner walls.

2. Installation of drywall framing, on the 1st floor.
Installation of guide frames for drywall partitions, drywall frame installation.

3. Cast-in belt pouring for roof parapets.
Concrete pouring.

Building B.
1. Installation of ledges for the stained glass windows.
On the 2nd floor.