Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. Plumbing work, installation of fixtures. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Installation of plasterboard frames. Installation of ceiling frames. 4. Plastering work. Application of decorative plaster on balconies. 5. Masonry work, 10th floor. Ceramic block masonry. 6. Infrastructure building. Monolithic work. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Plumbing work, installation of fixtures.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Installation of plasterboard frames.
Installation of ceiling frames.

4. Plastering work.
Application of decorative plaster on balconies.

5. Masonry work, 10th floor.
Ceramic block masonry.

6. Infrastructure building.
Monolithic work.