Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. Electrical installation work. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Plastering work. Application of decorative plaster to balconies. 4. Finishing work, 19th floor. Tiling of balconies. 5. Installation of plasterboard frames. Installation of ceiling frames. 6. Drilling of engineering holes. For the installation of engineering systems. 7. Infrastructure building. Monolithic work, installation of formwork for the floor slab on the 4th floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
Electrical installation work.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Plastering work.
Application of decorative plaster to balconies.

4. Finishing work, 19th floor.
Tiling of balconies.

5. Installation of plasterboard frames.
Installation of ceiling frames.

6. Drilling of engineering holes.
For the installation of engineering systems.

7. Infrastructure building.
Monolithic work, installation of formwork for the floor slab on the 4th floor.