Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Electrical installation work. — Installation of ventilation systems. 2. Installation of elevator shafts. Installation of elevator equipment. 3. Plastering work. Application of decorative plaster to balconies. 4. Installation of plasterboard frames. Installation of ceiling frames. 5. Infrastructure building. Monolithic work, installation of wall formwork, pouring of walls and columns on the 4th floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.
— Electrical installation work.
— Installation of ventilation systems.

2. Installation of elevator shafts.
Installation of elevator equipment.

3. Plastering work.
Application of decorative plaster to balconies.

4. Installation of plasterboard frames.
Installation of ceiling frames.

5. Infrastructure building.
Monolithic work, installation of wall formwork, pouring of walls and columns on the 4th floor.