Wyndham Grand Batumi Gonio. Family Club. Block A 1. Plastering work. — Plastering of slopes, 2nd floor. — Plastering of walls, 2nd floor. 2. Installation of plasterboard frame, 4th floor. Ceiling frame covering. 3. Installation of stained glass structures. Installation of double-glazed windows. 4. Installation of metal arches on balconies, 4th floor. Arch covering. Block B. 1. Installation of monolithic sides. For the installation of stained glass structures. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A
1. Plastering work.
— Plastering of slopes, 2nd floor.
— Plastering of walls, 2nd floor.

2. Installation of plasterboard frame, 4th floor.
Ceiling frame covering.

3. Installation of stained glass structures.
Installation of double-glazed windows.

4. Installation of metal arches on balconies, 4th floor.
Arch covering.

Block B.
1. Installation of monolithic sides.
For the installation of stained glass structures.