Wyndham Grand Batumi Gonio. Aqua
1. Installation of engineering systems.
— Electrical work.
— Plumbing work.
— Installation of a fire extinguishing system.
2. Facade work.
Facade texturing.
3. Plastering work.
Installation of decorative plaster on balconies.
4. Ceiling installation work.
Installation of ceiling frames on balconies.
5. Infrastructure building.
Installation of formwork for vertical structures on the 5th floor.