Wyndham Grand Batumi Gonio. Aqua 1. Installation of engineering systems. — Electrical work. — Plumbing work. 2. Plastering work. Installation of decorative plaster on balconies. 3. Ceiling installation work. Installation of ceiling frames on balconies, covering of frames. 4. Finishing work, 19th floor. Laying tiles on balconies. 5. Drilling of engineering holes, 1st floor. For subsequent installation of engineering systems. 6. Infrastructure building. — Formwork dismantling, 5th floor. — Ceramic block laying, 1st floor. - European Village

Wyndham Grand Batumi Gonio. Aqua

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Ceiling installation work.

Installation of ceiling frames on balconies, covering of frames.

4. Finishing work, 19th floor.

Laying tiles on balconies.

5. Drilling of engineering holes, 1st floor.

For subsequent installation of engineering systems.

6. Infrastructure building.

— Formwork dismantling, 5th floor.

— Ceramic block laying, 1st floor.