Wyndham Grand Batumi Gonio. Aqua. 1. Installation of engineering systems. — Electrical work. — Installation of fire extinguishing system. — Sealing of ventilation openings. 2. Plastering works. Installation of decorative plaster on balconies. 3. Ceiling installation works. Installation of ceiling frames on balconies, covering of frames. 4. Facade work. Plastering the facade. 5. Infrastructure building. — Reinforcement of vertical structures, 6th floor. — Ceramic block masonry, 2nd floor. 6. Welding work. - European Village

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Installation of fire extinguishing system.

— Sealing of ventilation openings.

2. Plastering works.

Installation of decorative plaster on balconies.

3. Ceiling installation works.

Installation of ceiling frames on balconies, covering of frames.

4. Facade work.

Plastering the facade.

5. Infrastructure building.

— Reinforcement of vertical structures, 6th floor.

— Ceramic block masonry, 2nd floor.

6. Welding work.