Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Facade work.
Plastering the facade.
2. Installation of storm drainage.
Covering storm drainage boxes.
3. Finishing work.
Laying porcelain tiles on balconies.
Block B
1. Plastering work.
Plastering walls on the 1st floor.
2. Installation of elevator shafts.
Laying elevator portal blocks.
3. Acceptance of materials.
Delivery and installation of