Wyndham Grand Batumi Gonio. Family Club. Block A 1. Facade work. Plastering the facade. 2. Installation of storm drainage. Covering storm drainage boxes. 3. Finishing work. Laying porcelain tiles on balconies. Block B 1. Plastering work. Plastering walls on the 1st floor. 2. Installation of elevator shafts. Laying elevator portal blocks. 3. Acceptance of materials. Delivery and installation of double-glazed windows. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Facade work.

Plastering the facade.

2. Installation of storm drainage.

Covering storm drainage boxes.

3. Finishing work.

Laying porcelain tiles on balconies.

Block B

1. Plastering work.

Plastering walls on the 1st floor.

2. Installation of elevator shafts.

Laying elevator portal blocks.

3. Acceptance of materials.

Delivery and installation of double-glazed windows.