Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables, 12th floor.
— Plumbing work.
— Installation of air conditioning pipes, 20th floor.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame,
Installation of frame for
4. Finishing works, 19th floor.
Laying tiles on balconies.
5. Roof work.
Tie beams.
6. Infrastructure building.
Installation of floor slab formwork, 6th floor.