Wyndham Grand Batumi Gonio. Aqua. 1. Installation of engineering systems. — Electrical work, laying electrical cables, 12th floor. — Plumbing work. — Installation of air conditioning pipes, 20th floor. 2. Plastering work. Installation of decorative plaster on balconies. 3. Installation of plasterboard frame, 11th-13th floors. Installation of frame for inter-unit partitions, covering of frame. 4. Finishing works, 19th floor. Laying tiles on balconies. 5. Roof work. Tie beams. 6. Infrastructure building. Installation of floor slab formwork, 6th floor. - European Village

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work, laying electrical cables, 12th floor.

— Plumbing work.

— Installation of air conditioning pipes, 20th floor.

2. Plastering work.

Installation of decorative plaster on balconies.

3. Installation of plasterboard frame, 11th-13th floors.

Installation of frame for inter-unit partitions, covering of frame.

4. Finishing works, 19th floor.

Laying tiles on balconies.

5. Roof work.

Tie beams.

6. Infrastructure building.

Installation of floor slab formwork, 6th floor.