Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, wiring.
— Plumbing work, 18th floor.
— Installation of air conditioning pipes, 16th floor.
— Installation of ventilation system, 9th floor.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frame, 16th floor.
Installation of frame for
4. Installation of panoramic elevator.
Installation and reinforcement of panoramic elevator slabs.
5. Infrastructure building.
— Concreting of floor slabs, 6th floor.
— Laying of ceramic blocks, 2nd floor.