Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, wiring.
— Plumbing work.
— Installation of air conditioning pipes.
— Installation of ventilation system.
2. Plastering work.
Installation of decorative plaster on balconies.
3. Installation of plasterboard frames.
Installation of frames for
4. Finishing works, 9th floor.
Laying tiles on balconies.
5. Infrastructure building.
— Installation of formwork for vertical structures, 7th floor.
— Laying ceramic blocks, 3rd floor.