Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Plastering works. Plastering walls. 3. Facade works. Plastering the facade. 4. Workshop works. Manufacturing stairs. Block B 1. Ceiling installation. Installation of ceiling frames. 2. Elevator shaft installation. Block laying in elevator portals. 3. Drilling of engineering holes. For subsequent installation of engineering systems. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering works.

Plastering walls.

3. Facade works.

Plastering the facade.

4. Workshop works.

Manufacturing stairs.

Block B

1. Ceiling installation.

Installation of ceiling frames.

2. Elevator shaft installation.

Block laying in elevator portals.

3. Drilling of engineering holes.

For subsequent installation of engineering systems.