Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Plastering work. Plastering balconies. 3. Facade work. — Plastering the facade. — Facing the facade and slopes with clinker tiles. — Installing metal mesh under the clinker tile facing on the facade. 4. Installation of elevator shafts. Laying blocks in elevator portals. 5. Workshop work. Manufacturing stairs and preparing materials for radius arches on balconies. 6. Waterproofing work. Waterproofing the roof, installing the membrane. 7. Installation of stained glass structures. Installation of glazing in stained glass windows. Block B 1. Installation of ceilings. Installation of ceiling frames. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Plastering work.

Plastering balconies.

3. Facade work.

— Plastering the facade.

— Facing the facade and slopes with clinker tiles.

— Installing metal mesh under the clinker tile facing on the facade.

4. Installation of elevator shafts.

Laying blocks in elevator portals.

5. Workshop work.

Manufacturing stairs and preparing materials for radius arches on balconies.

6. Waterproofing work.

Waterproofing the roof, installing the membrane.

7. Installation of stained glass structures.

Installation of glazing in stained glass windows.

Block B

1. Installation of ceilings.

Installation of ceiling frames.