Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables, 7th floor.
— Plumbing work, drainage installation, 17th floor.
— Installation of air conditioning pipes.
2. Installation of plasterboard frame, 19th floor.
Installation of
3. Finishing works, 9th and 19th floors.
Tiling of balconies.
4. Plastering works.
— Plastering of balconies.
— Plastering of the facade.
5. Roof work.
Tying up the roof trusses.
6. Installation of stained glass structures, 10th floor.
Assembly of stained glass windows.
7. Installation of a panoramic elevator.
Installation of formwork for the balconies of panoramic elevators.
8. Waterproofing work, 18th floor.
Installation of coating waterproofing on balconies.
9. Infrastructure building.
— Concreting of floor slabs, 7th floor.
— Laying of ceramic blocks, 3rd floor.