Wyndham Grand Batumi Gonio. Aqua. 1. Installation of engineering systems. — Electrical work. — Plumbing work. — Installation of air conditioning pipes. 2. Installation of plasterboard frame. Installation of frame for inter-unit partitions, insulation of internal partitions. 3. Finishing works, 8th, 18th-19th floors. Laying tiles on balconies. 4. Infrastructure building. — Reinforcement of vertical structures, 8th floor. — Laying ceramic blocks, 4th floor. - European Village

Wyndham Grand Batumi Gonio. Aqua.

1. Installation of engineering systems.

— Electrical work.

— Plumbing work.

— Installation of air conditioning pipes.

2. Installation of plasterboard frame.

Installation of frame for inter-unit partitions, insulation of internal partitions.

3. Finishing works, 8th, 18th-19th floors.

Laying tiles on balconies.

4. Infrastructure building.

— Reinforcement of vertical structures, 8th floor.

— Laying ceramic blocks, 4th floor.