Wyndham Grand Batumi Gonio. Family Club. Block A 1. Finishing works. Laying porcelain stoneware on balconies. 2. Facade works. — Facing the facade and slopes with clinker tiles. — Installation of a reinforcing layer on the facade outside the balconies. 3. Workshop work. Manufacturing of stairs and preparation of material for the radius arches of balconies. 4. Waterproofing work. — Waterproofing of the roof. — Installation of the second layer of coating waterproofing on balconies, 3rd floor. Block B 1. Installation of ceilings. Installation of ceiling frames. 2. Drilling of engineering holes. For subsequent installation of engineering systems. 3. Facade work. Plastering of the facade. - European Village

Wyndham Grand Batumi Gonio. Family Club.

Block A

1. Finishing works.

Laying porcelain stoneware on balconies.

2. Facade works.

— Facing the facade and slopes with clinker tiles.

— Installation of a reinforcing layer on the facade outside the balconies.

3. Workshop work.

Manufacturing of stairs and preparation of material for the radius arches of balconies.

4. Waterproofing work.

— Waterproofing of the roof.

— Installation of the second layer of coating waterproofing on balconies, 3rd floor.

Block B

1. Installation of ceilings.

Installation of ceiling frames.

2. Drilling of engineering holes.

For subsequent installation of engineering systems.

3. Facade work.

Plastering of the facade.