Wyndham Grand Batumi Gonio. Aqua.
1. Installation of engineering systems.
— Electrical work, laying electrical cables.
— Plumbing work, installation of drainage.
— Installation of air conditioning pipes.
2. Installation of plasterboard frame.
Installation of frame for
3. Finishing works, 8th and 18th floors.
Laying tiles on balconies.
4. Plastering work.
— Plastering balconies.
— Plastering the facade.
5. Installation of a panoramic elevator.
Installation of formwork for balconies of panoramic elevators.
6. Infrastructure building.
— Reinforcement of vertical structures, 8th floor.
— Ceramic block masonry, 4th floor.