Wyndham Grand Batumi Gonio. Family Club.
Block A
1. Finishing work.
Laying porcelain stoneware on balconies.
2. Plastering work.
Plastering slopes on stairwells.
3. Workshop work.
Manufacturing of stairs and preparation of materials for the radius arches of balconies.
4. Waterproofing work.
Installation of the second layer of coating waterproofing on balconies, 3rd floor.
Block B
1. Installation of ceilings.
Installation of ceiling frames.
2. Drilling of engineering holes.
For subsequent installation of engineering systems.
3. Facade work.
Installation of a reinforcing layer of mineral wool on the walls of the balconies.
4. Plastering work.
Plastering on the balconies.