22.11.2023 Wyndham Grand Residences Batumi Gonio. Riviera In Block A, the 2nd floor floor slab formwork installation continues in the 1st half. In the 2nd half, reinforcement of the 2nd floor columns. Excavation works are being carried out at the site of Block B. - European Village