06.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Concreting of the columns of the 19th construction (18th hotel) floor has been completed. Ceramic block wall masonry continues on the ninth (8th) floor and has begun on the eleventh (10th) floor. - European Village

06.12.2023 Wyndham Grand Residences Batumi Gonio. Aqua Concreting of the columns of the 19th construction (18th hotel) floor has been completed. Ceramic block wall masonry continues on the ninth (8th) floor and has begun on the eleventh (10th) floor.