19.12.2023 Elite Family Residence On the 6th construction (5 residential) and 7th (6) floors, the walls are being masoned with ceramic block. Preparations for the masonry parapet on the roof have begun. - European Village

19.12.2023 Elite Family Residence On the 6th construction (5 residential) and 7th (6) floors, the walls are being masoned with ceramic block. Preparations for the masonry parapet on the roof have begun.