21.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: In the 1st half the formwork for the 3rd floor columns is being erected. In the 2nd half, the installation of the roof slab formwork. Block B: Excavation work continues. Block E: Work on walls and internal partition walls on the floors is in progress. - European Village

21.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A: In the 1st half the formwork for the 3rd floor columns is being erected. In the 2nd half, the installation of the roof slab formwork. Block B: Excavation work continues. Block E: Work on walls and internal partition walls on the floors is in progress.