27.12.2023 Wyndham Grand Residences Batumi Gonio. Riviera Block A Work continues on the installation of formwork for the 3rd floor columns in the 1st half and reinforcement of the roof slab in the 2nd half. Block B Excavation work continues. Block E The laying of walls and internal partition walls with ceramic block is carried out on floors.