27.12.2023 Elite Family Residence Ceramic block walls are being laid on the 7th construction (6th residential) floor and the parapet is being laid on the roof. - European Village

27.12.2023 Elite Family Residence Ceramic block walls are being laid on the 7th construction (6th residential) floor and the parapet is being laid on the roof.