15.01.2024 Elite Family Residence On the floors, the walls are masoned with ceramic block. The installation of the lintels is underway on the 6th construction (5th residential) floor. - European Village

15.01.2024 Elite Family Residence On the floors, the walls are masoned with ceramic block. The installation of the lintels is underway on the 6th construction (5th residential) floor.