29.01.2024 Elite Family Residence Work is underway on masonry walls with ceramic block and installation of arched lintels. The building is connected to the city sewerage system. - European Village

29.01.2024 Elite Family Residence Work is underway on masonry walls with ceramic block and installation of arched lintels. The building is connected to the city sewerage system.