31.01.2024 Wyndham Grand Residences Batumi Gonio. Aqua The installation of the roof slab formwork has started on the 20th construction (19th hotel) floor. On the 14th construction (13 hotel) and on the 15th (14) floors, the masonry walls are being laid with ceramic block. - European Village