27.02.2024 Wyndham Grand Residences Batumi Gonio. Riviera Dismantling of the formwork continues in block A. Formwork assembly of the basement walls is underway in the 1st part of block B, in the 2nd part the foundation preparation is concreted. The foundation for the foundation of block C has been started. In block E the walls are being laid with ceramic block. - European Village

27.02.2024 Wyndham Grand Residences Batumi Gonio. Riviera Dismantling of the formwork continues in block A. Formwork assembly of the basement walls is underway in the 1st part of block B, in the 2nd part the foundation preparation is concreted. The foundation for the foundation of block C has been started. In block E the walls are being laid with ceramic block.